• For 2024 Pilgrims: €50,- donation = 1 year with no ads on the forum + 90% off any 2024 Guide. More here.
    (Discount code sent to you by Private Message after your donation)

Search 69,459 Camino Questions

Recent content by Urdos653Eric

  1. U

    GR653 path closed at Cette-Eygun (diversion via N134 road)

    Hello, The path between Cette-Eygun and Borce is open, a path has been dug above the washed away area. (see photo) It is tagged again and the passage ban has been lifted. See Flog's thread : https://www.caminodesantiago.me/community/threads/camino-aragones-notes-and-observations-april-24.86565/
  2. U

    DETOUR: bridge out near Canfranc

    Yes, but 10m of difficulty against 4km along the road. And the path is beautiful. And this is only temporary while waiting for the bridge to be rebuilt.
  3. U

    DETOUR: bridge out near Canfranc

    Hello, A temporary staircase has been installed to cross the river in Canfranc until the construction of the permanent footbridge is completed. It will be sturdier than the previously placed plank. However, please be cautious during heavy rains, as the base of the staircase is located in the bed...
  4. U

    A couple of Aragonés questions

    Hello, For your information, the bridge is closed. Detour to the left at the foot of the bridge (if the river isn’t too high), otherwise follow the road. See the latest Facebook post from the friends of Santiago de Jaca. Photo pont Canfranc
  5. U

    Urdos to Somport Advice

    Hello Be careful, snow has fallen on the Pyrenees and the path between Urdos and Canfranc-Estacion is snowy. I am providing the link to the webcams on the Spanish route N330a. (See the last four from left to right. : Villanua / entrance to the tunnel at Canfranc / Lower crossing of Candanchu /...
  6. U

    GR653 path closed at Cette-Eygun (diversion via N134 road)

    Hello Andycohn, Please note that this event has nothing to do with the construction site between Borce and Urdos, the latter is paused this winter and while a Bearded Vulture nests, possible resumption around early May. So for now, it’s the N134 road (with traffic) from Accous to Urdos, or the...
  7. U

    GR653 path closed at Cette-Eygun (diversion via N134 road)

    Hello, Following a landslide that took away part of the trail at the exit of Cette-Eygun (between Accous and Borce), the GR is closed for an indefinite period (the shortest possible [I hope]). A diversion has been set up by the N134 road (be careful, the road is narrow). Or you can take bus...

❓How to ask a question

How to post a new question on the Camino Forum.
This site is run by Ivar at

in Santiago de Compostela.
This site participates in the Amazon Affiliate program, designed to provide a means for Ivar to earn fees by linking to Amazon
Official Camino Passport (Credential) | 2024 Camino Guides
Back
Top