• For 2024 Pilgrims: €50,- donation = 1 year with no ads on the forum + 90% off any 2024 Guide. More here.
    (Discount code sent to you by Private Message after your donation)
This is a mobile optimized page that loads fast, if you want to load the real page, click this text.

Line 1 of madrid metro closure

piogaw

Veteran Member
Time of past OR future Camino
Camino frances (05/06 2012) sjpdp-sdc; vdlp/camino sanabrea (02/03 2013) sevilla-sdc; hospitalero sdc june 2013, august-september 2013; caminho portugues (03 2014) lisboa-sdc
To all peregrinos passing through madrid,

Please note line 1 of the madrid metro is closed at sections from bilbao station to sol station due to maintenance work until september. If you are going from chamartin station to sol station or to atocha station you will have to make other arrangement with the other lines and to be sure that you have allocated extra time to reach your destination.
 
Last edited:
The focus is on reducing the risk of failure through being well prepared. 2nd ed.

Most read last week in this forum